HomeNewsIndiaFrom horses to heavy machinery: Building the iconic Chenab railway bridge in Jammu & Kashmir

From horses to heavy machinery: Building the iconic Chenab railway bridge in Jammu & Kashmir

Remarkably standing high, 359 metres above the river, the Chenab Bridge is 35 metres taller than the Eiffel Tower and is now the highest railway bridge in the world.

June 07, 2025 / 10:28 IST
PM Modi, on Friday, unveiled the Chenab Bridge, along with the Anji Rail Bridge and the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project.

Realising the dream of a seamless rail journey from Kashmir to Kanyakumari came with daunting engineering challenges, primary among them, building the world’s highest railway bridge over the Chenab River in the treacherous terrain of the Himalayas.

Interestingly, when construction first commenced, the only way to access the Chenab bridge site was on horseback.

“Initially, we relied on mules and horses to transport both our teams and materials,” says a spokesperson for Afcons Infrastructure Limited, the company behind the construction. “Gradually, temporary access roads were built, an 11-km stretch on the North bank and 12 km on the South, to support the project.”

PM Modi, on Friday, unveiled the Chenab Bridge, along with the Anji Rail Bridge and the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project. Additionally, he flagged off new Vande Bharat trains linking Katra and Srinagar, marking a new era of connectivity in Jammu & Kashmir.

Remarkably standing high, 359 metres above the river, the Chenab Bridge is 35 metres taller than the Eiffel Tower and is now the highest railway bridge in the world.

“This isn’t just a feat of engineering, it’s a symbol of India’s determination to overcome impossible odds,” says Krishnamurthy Subramanian, Executive Vice Chairman of Afcons.

To meet the challenge, Afcons deployed some of the most advanced construction technologies in the world, including the tallest crossbar cable cranes and heavy-duty machinery. The Himalayan slopes were stabilised using massive consolidation grouting, allowing for secure foundations to be laid for the bridge’s signature arch.

The arch was constructed using the cantilever method from both riverbanks. On April 5, 2021, both halves met perfectly at the crown, marking a key milestone in the project’s timeline.

The viaduct section posed its own set of technical hurdles, requiring incremental launching on a transition curve and gradient - a first in Indian Railways history.

“We planned the deck launching in four meticulously engineered segments,” said Giridhar Rajagopalan, Deputy Managing Director, Afcons.

To ensure top-tier quality throughout, Afcons also established an NABL-accredited laboratory on-site, another first for an Indian Railways project.

“This bridge is a tribute to Indian engineering, teamwork, and our commitment to nation-building,” said S. Paramasivan, Managing Director, Afcons. “It will inspire generations to come.”

After the inauguration, PM Modi walked the length of the bridge carrying the Tricolour, underscoring the project’s national significance.

(With inputs from PTI)

Moneycontrol News
first published: Jun 7, 2025 10:28 am

Discover the latest Business News, Sensex, and Nifty updates. Obtain Personal Finance insights, tax queries, and expert opinions on Moneycontrol or download the Moneycontrol App to stay updated!

Subscribe to Tech Newsletters

  • On Saturdays

    Find the best of Al News in one place, specially curated for you every weekend.

  • Daily-Weekdays

    Stay on top of the latest tech trends and biggest startup news.

Advisory Alert: It has come to our attention that certain individuals are representing themselves as affiliates of Moneycontrol and soliciting funds on the false promise of assured returns on their investments. We wish to reiterate that Moneycontrol does not solicit funds from investors and neither does it promise any assured returns. In case you are approached by anyone making such claims, please write to us at grievanceofficer@nw18.com or call on 02268882347