Get App Open
In App
News on WhatsApp
News on WhatsApp
Open App

IRB Infrastructure Developers Ltd.

BSE: 532947 | NSE: IRB |

Represents Equity.Intra - day transactions are permissible and normal trading is done in this category
Series: EQ | ISIN: INE821I01022 | SECTOR: Transport Infrastructure

BSE Live

Dec 18, 16:01
40.76 -0.32 (-0.78%)
Volume
AVERAGE VOLUME
5-Day
659,862
10-Day
632,396
30-Day
2,067,479
634,268
  • Prev. Close

    41.08

  • Open Price

    41.01

  • Bid Price (Qty.)

    40.76 (1)

  • Offer Price (Qty.)

    40.76 (3)

NSE Live

Dec 18, 15:59
40.76 -0.30 (-0.73%)
Volume
AVERAGE VOLUME
5-Day
6,336,954
10-Day
7,045,923
30-Day
10,818,116
4,294,270
  • Prev. Close

    41.06

  • Open Price

    41.06

  • Bid Price (Qty.)

    0.00 (0)

  • Offer Price (Qty.)

    40.76 (3379)

Company History - IRB Infrastructure Developers
The Company was incorporated as a private 
 limited company,DVJ Leasing and Finance Private Limited
  on July 27,1998 under the Companies Act. The Company
 was primarily formed to fund the capital requirement of the 
 IRB Group’sinitiatives in the infrastructure and construction
 sectors
 Although the Company was incorporated as a leasing and
 financing company, it did not undertake any leasing business.
 
 In the past, the Company has carried on certain maintenance 
 operations for road projects constructed by other entities in the 
 IRB Group. In 2005, the Company was granted the Bharuch Surat
 BOT project. Subsequently, pursuant to the restructuring of the 
 IRB Group in the fiscal year 2007, the Company became the holding 
 company of the  IRB Group
 
 Following the restructuring of the IRB Group, the name of the 
 Company was changed from DVJ Leasing and Finance Private 
 Limited to IRB Infrastructure Developers Private Limited pursuant to
 a special resolution of the shareholders of the Company at an EGM
 held 
 on October 30, 2006. The fresh certificate of incorporation 
 consequent upon the change of name was granted by the RoC on 
 November 8, 2006. Subsequently, pursuant to a special resolution 
 of the shareholders of the Company at an EGM held on
 November  25, 2006, the Company became a public limited
 company and the word private was deleted from its name. 
 The certificate of incorporation to reflect the new name was 
 ssued by the RoC on November 27, 2006.
 
 IDAA become the subsidiary of the Company on June 21, 2006. 
 The Company subsequently subscribed to 66% of the shareholding 
 in Aryan on July 18, 2007. On September 8, 2007, the Company
 increased 
 its shareholding in IRBPL, MIPL, TGTRPL, IRB Infra and NKT to
 further
 consolidate the Company’s shareholding in  the Subsidiaries. 
 For further information on such reconstruction see Management’s 
 Discussion and Analysis of Financial Condition and Results of
 Operations 
 as per the  consolidated Financial Statements .
 
 The registered office of the Company was shifted with effect from
 July 1, 1999 from  Manisha Safalya, Mahatma Gandhi Road, Dombivli, 
 Mumbai  421 202, to 501, Dattashram,Hindu Colony, Lane No.1, Dadar
 Mumbai  400 014. Thereafter, the registered office of the Company 
 was shifted to 3rd Floor, IRB Complex, Chandivli Farm, Chandivli
 Village, 
 Andheri (East),Mumbai  400 072 with effect from November 28,
 2006.Ideal 
 Road Builders Private Limit
 
 
 1977 IRBPL was incorporated as a private limited company.
 
 1977 to 1995 Execution of various construction contracts in the
 roads
 sector including World Bank aided projects as an EPC contractor.
 
 September 1995 First venture in BOT Project being the signing of the
  Concession  Agreement for Thane Bhiwandi Bypass Phase 
 
 June 1997 Completion of the construction activities in the Thane
 Bhiwandi 
  Bypass 
 
 November 1997 Signing of the concession agreement for the Kharpada
 Project for construction of a bridge over river Patalganga on a BOT
 basis.
 
 January 1998 Signing of the concession agreement for the Bhiwandi 
 Wada project   on a BOT basis.
 
 July 1998 Incorporation of the Company as a private limited company.
 
 September 1998 Signing of the concession agreement for the
 Thane Bhiwandi  Bypass Phase II on a BOT basis.
 
 November 1998 Signing of the concession agreement for the 
 Khambatki Ghat project on a BOT basis.
 
 December 1998 Signing of concession agreement for the Kaman 
 Paygaon project on a BOT basis.
 
 February 4, 1999 Completion of the Bhiwandi Wada project on
  a BOT basis.
 
 July 20, 1999 Completion of the Kharpada Project Bridge over 
 River Patalganga  on a BOT basis.
 
 March 25, 2000 Completion of the Kaman Paygaon project 
 on a BOT basis
 .
 August 15, 2000 Completion of the Khambatki Ghat project
  on a BOT basis.
 
 January 2001 Signing of the joint venture agreement with 
 Mudajaya Corporation of Malaysia for the execution of NHAI funded
  contract for the Ratanpur to Himmatnagar section of NH 8 for 54
 kms.
 
 January 2001 Signing of a funded EPC contract for the Ratanpur to 
 Himmatnagar section of NH 8 for 54 kms with the NHAI.
 
 November 2001 Signing of the concession agreement for the
 Ahmadnagar-Karmala-Temburni Road project on a BOT basis.
 
 May 2002 Signing of an O&M and rehabilitation works contract 
 with the NHAI for the Chiloda Naroda Section, Ahmedabad Bypass 
 and the Ahmedabad Vadodara Section of NH 8 inGujarat.
 
 May 2002 Signing of an O&M and rehabilitation works contract 
 with the NHA I for Vadodara-Surat section of NH 8 in Gujarat.
 
 May 2002 
 Signing of the concession agreement for the Mohol-Kurul-Kamti-Mandrup
 road on a BOT basis.
 
 February 2003 
 Signing of the concession agreement for the Pune Sholapur Project on
 a BOT basis.August 25, 2003 Completion of construction activities i n
 the Ahmadnagar-Karmala-Temburni Road
 project on a BOT basis
 .
 August 2003 
 Signing of the concession agreement for the Pune Nashik project on a
 BOT basis.
 
 December 2003 
 Completion of the Thane Bhiwandi Bypass  Phase II.
 
 December 2003 
 Completion of the construction activities in  Thane Bhiwandi Bypass
 BOT project - Phase
 
 January 2004 
 Completion of the construction activities for the funded EPC Contract
 for the Ratanpur to Himmatnagar Section  of NH 8 for 54 kms.
 
 May 2004 
 Emerged as the highest bidder for Mumbai-Pune  Expressway project  by
 making upfront payment of Rs. 918 crore to MSRDC for concession rights
 for a period of 15 years.
 
 August 2004
 
 Signing of the concession agreement and financial closure of the
 Mumbai Pune Expressway project of Rs. 1,181.41 crore. 
 
 August 2004
 Commencement of construction activities of the NH 4 and commencement
 of toll collection on the Mumbai Pune Expressway. 
 
 December 10, 2004 
 Completion of construction activities for the Pune Sholapur BOT
 project. 
 
 April 2005 
 Commencement of construction activities on the O&M on Mumbai-Pune
 Expressway as BOT operator. 
 
 July 2005 
 Signing of the concession agreement with the NHAI for the the
 four-laning of (a) km 64-000 to km 94-000 and (b) Km 123 to km 153 of
 the Nagpur-Hyderabad section of NH 7 in the State of Maharashtra. 
 
 November 2005
 Emerged as the highest bidder for the Thane Ghodbunder project by
 offering a negative grant of Rs. 140.40 crore to the MSRDC for
 concession rights for a period of 15 years. 
 
 December 20, 2005 
 Completion of the construction activities for the Pune-Nashik
 Project. 
 
 December 2005 
 Signing of the concession agreement and financial closure of the
 Thane Ghodbunder project with financing of Rs.216.60 crore and
 commencement of toll collection. 
 
 July 2006 
 Signing of the concession agreement for the Bharuch Surat project on
 a BOT basis. 
 
 September 2006 
 Commencement of toll collection on Mumbai- Pune NH 4. 
 
 December 2006
 Achieved financial closure of the Bharuch Surat project with
 financing of Rs. 1,210.95 crore. 
 
 December 2006 
 Payment of a negative grant to NHAI of Rs. 504 crore in respect of
 the Bharuch Surat project. 
 
 January 2007 
 Formed a consortium with Deutsche Bank AG, Singapore to jointly
 pre-qualify for eight packages of four to six laning under NHDP V. 
 
 February 2007
 Awarded the contract by the Ahmedabad Municipal Corporation for the
 construction of Janmarg (Bus Rapid Transport System Project) from
 Narol Circle to Naroda Patiya in Ahmedabad for a total project cost
 of Rs. 132.99 crore. 
 
 April 2007
 Balance work of construction of Tapi Bridge amount to Rs. 44.15 crore
 was awarded as an additional scope of work to Bharuch Surat BOT
 Project 
 
 June 2007 
 Awarded the funded contract by the Ahmedabad Municipal Corporation
 for construction of Janmarg (Bus Rapid Transport System Project) from
 Pirana-Danilimada-Maninagar-Narol in Ahmedabad for a total project
 cost of Rs. 78.36 crore. 
 
 July 2007 
 Successfully Completed the construction phase of the Thane-Ghodbunder
 project. 
 
 September 2007 
 Granted pre-qualified status that entitled the IRB Group to submit
 request for proposals for certain NHDP Phase V road infrastructure
 projects; namely, the Chennai-Tada project on NH 5, the Gurgaon -
 Kotputli - Jaipur project on NH 8, the Surat - Dahisar project on NH
 8, the Chilkaluripet - Vijayawada project on NH 5 and the Panipat -
 Jalandhar project on NH 1. 
 
 September 2007 
 Acquisition of shares in IRBPL, IRB Infra, NKT, TGTRPL and MIPL
 making them wholly-owned Subsidiaries of the Company. 
 
 November 2007 
 Submitted bids for the Gurgaon - Kotputli - Jaipur project on NH 8
 and the Surat - Dahisar project on NH 8. For further information, see
 Business-Our BOT Infrastructure Development Projects - Recent
 Developments on page 83 of this Prospectus 
 
 December 2007 
 Submitted a bid for a BOT project relating to the Integrated Road
 Development Program in Kolhapur. 
 
 January 2008 
 Company has launch its Initial Public Issue duing 31st January 2008
 to 5th February 2008. The issue was oversubscribed by 4.3 times.
 Issue price thereafter was fixed at Rs. 185/- per share 
 
 February 2008 
 Declared as Successful Bidder for the Project of  Six Lanning of
 Surat - Dahisar section of NH-8 from Km 263.00 to Km 502.00 (Length -
 239 Km ) in the state of Gujarat / Maharashtra to be executed as BOT
 (Toll) basis on DBFO Pattern under NHDP Phase - V 
 
 February 2008 
 Company was listed on Bombay Stock Exchange and National Stock
 Exchange on 25th February 2008 
 
 February 2008 
 Declared as Successful Bidder for the project of  Integrated Road
 Development Programme (IRDP) for Kolhapur City 
 
 April 2008 
 Concession Agreement for 6 - Laning of Surat - Dahisar BOT Project on
 DBFO pattern has been executed on 30th April 2008 Between National
 Highways Authority of India and IRB Surat Dahisar Tollway Private
 Limited at New Delhi  
 
 
 2009
 
 -IRB has emerged as lowest bidder for a Jaipur Tonk Deoli BOT Project
 of NHAI
 
 -IRB wins the CNBC TV 18 Essar Steel Infrastructure Excellence Award
 
 -IRB hits a Four !!! emerged as lowest bidder for a Talegaon Amravati
 BOT Project of NHAI
 
 2010
 
 -The Company have received an official communication from the
 National Highways Authority of India (NHAI) by way of a Letter of
 Award whereby NHAI has accepted Company's Price Bid and has declared
 the Company as the Selected Bidder for the Project of Four Laning of
 Goal Karnataka Border to Panaji - Goa stretch of NH-4A from Km 84.000
 to Km 153.070 in the State of Goa on BOT Toll Basis on DBFO pattern.
 
 -IRB Infrastructure Developers has bagged the six-laning of
 Tumkur-Chitradurga section of NH-4 in the state of Karnataka.
 
 2011
 
 -IRB Infra emerges preferred bidder for Ahmedabad to Vadodara highway
 project
 
 2012
 -IRB Infra  has Acquired MVR Infrastructure & Tollways Pvt. Ltd
 
 2013
 -IRB Infrastructure Developers wins Rs. 1500 Cr project from
 Maharashtra Govt
 
 2014
 -IRB Infra receives letter of award for MSRDC project
 -IRB Infrastructure Developers Ltd has bagged Rs 2,300 crore road
 project in Haryana from National Highways Authority of India
 
 2015
 -IRB Infrastructure Developers Ltd  Yedeshi Aurangabad Tollway Pvt.
 Ltd. wholly-owned Subsidiary of the Company
 -IRB Infra receives LOA for Agra -Etawah Bypass project
 -IRB executes agreement with NHAI for six laning project
 -AE Tollway Private Limited - Wholly-owned Subsidiary of the Company 
 now executed Concession Agreement with NHAI
 
 2016
 - IRB Infra bags DBFOT road project in Rajasthan
 - IRB Infra bags road project from NHAI
 
 2017
 -IRB Infra the Company has completed the process of acquisition of
 remaining 26 per cent stake in M.V.R. Infrastructure And Tollways
 Pvt. Ltd.
 -IRB Infra received latter of award from National Highways Autority
 of india for Hybrid Annuity Project under Phase VI in Gujarat.
 -IRB Infra received latter of award from National Highways Autority
 of india for two Hybrid Annuity Project under NHDP Phase VI in Tamil
 Nadu.
 
 2018
 
 -The company said its engineering, procurement and construction order
 book stands at about Rs 13,200 crore, including Rs 12,600 crore of
 construction order book, 
 
 - IRB Infra ties up Rs 981 cr from lenders for Vadodara-Mumbai
 Expressway section
 
 - IRB Infra had bagged three projects under Hybrid Annuity Model in
 March 2018.
 
 -This is to inform you that IRB Hapur Moradabad Tollway Private
 Limited- Wholly-owned Subsidiary of the Company, has now executed
 Concession Agreement with NHAI for the project of Six Laning of Hapur
 bypass to Moradabad section including Hapur bypass from Km 50.000
 (Design Ch. Km 50.000) to Km 148.277 (Design Ch. Km 149.867) of NH 24
 (New NH-9) in the State of Uttar Pradesh on DBFOT basis under NHDP
 Phase V Project.
 
 - ''The Company has received Letter of Acceptance (LOA) from
 Hyderabad Growth Corridor Limited (HGCL) for the project of
 ?Collection of user fee through an agency purely on temporary daily
 basis for Hyderabad Outer Ring Road for a length of 158 km in the
 state of Telangana, India?.Key highlights of the Project are as
 under:1. This gives the Company User Fee collection rights on
 temporary basis at Hyderabad Outer Ring Road. 2. The Contractual
 amount for the said Project is Rs. 87 Lacs per day for such period as
 may be agreed between HGCL and the Company.  3. The toll operation
 will commence by May 23, 2018 subject to the compliance of statutory
 formalities viz. submission of performance security, signing of
 contract as per the LOA. ''.
 
 -IRB Infrastructure Developers Limited has said that IRB PS Highway
 Private Limited and IRB PP Project Private Limited - wholly-owned
 subsidiaries of the company have executed concession agreement with
 National Highways Authority of India (NHAI) for two Hybrid Annuity
 Projects under NHDP Phase IV in the state of Tamil Nadu.
 
 --IRB Infrastructure Developers said that it has received LoA for a
 project in Uttar Pradesh.
 
 2019
 
 -Singapore's sovereign wealth fund GIC will invest up to Rs 4,400
 crore in the road assets of IRB Infrastructure Developers, according
 to a company statement  As part of the transaction, IRB will transfer
 9 of its BOT (build, operate and transfer) assets into a private
 infrastructure investment trust in which IRB will hold controlling
 stake of 51 per cent, IRB.
 
 - IRB Infrastructure Trust - Private InvIT has successfully closed
 2nd Tranche of fund raising by way of Rights Issue of Units amounting
 to Rs. 510 Crore. The Company being the Sponsor and 51% stakeholder,
 contributed Rs. 260 Crore and the GIC Affiliates holding 49% have
 contributed balance Rs. 250 Crore.  This is part of the total
 commitment of Rs. 4,400 Crore by GIC affiliates towards 49% stake in
 Pvt InvIT housing 9 BOT assets, out of which IRB Infrastructure Trust
 has already receive 3,753 Crores from GIC affiliates in February,
 2020.

Further the Company will continue to hold 51% and GIC affiliates will continue to hold a 49% stake in the IRB Infrastructure Trust. 2021 -The Company has emerged as the Selected Bidder for the Project of Development of Access Controlled Six Lane (Expandable to Eight Lane) Greenfield ''Ganga Expressway'' Group-I, from Km. 7+900 (Village: Bijoli, Distt: Meerut) to Km. 137+600, (Village: Nagla Barah, Distt: Budaun), Design length 129.700 Km in the State of Uttar Pradesh on DBFOT (Toll) basis under PPP and have received Letter of Award (LOA) dated December 16, 2021 from Uttar Pradesh Expressways Industrial Development Authority (UPEIDA). -IRB INFRASTRUCTURE DEVELOPERS LTD.has informed that the meeting of the Company is scheduled on 26/10/2021 ,inter alia, to consider and approve In continuation to our earlier intimation dated October 20, 2021 and pursuant to Regulation 29(1)(d) of the SEBI Listing Regulations, also consider and approve, inter alia, a proposal of fund raising by way of issue of equity shares/ bonds/ debentures/ non-convertible debt instruments/ securities and/or any other instruments/ any other securities including through preferential issue on a private placement basis, qualified institutions placement, rights issue or any other methods or combination thereof including determination of issue price as may be permitted under applicable laws, subject to such regulatory or statutory approvals as may be required and the approval of the shareholders of the Company. -RB Infrastructure Developers Limited has informed that regarding ''IRB Infrastructure Trust Private InvIT has successfully closed fund raising by way of Rights Issue of Units amounting to Rs. 381.63 Crores from existing unitholders. The Company being the Sponsor and 51% unitholder of the Private InvIT, invested Rs. 194.63 Crores and GIC Affiliates holding 49% units have invested Rs. 187.00 Crores''. 2022 -IRB Infra achieves financial closure for Rs 6538 cr Ganga Expressway project. 2023 -The Company has splits its face value from Rs. 10/- to Rs. 1/-. -IRB Infra SPV receives Appointed Date from the NHAI for its Samakhiyali Santalpur BOT Project in the State of Gujarat. -IRB Infrastructure Trust receives the Letter of Award (LoA) from NHAI for Rs. 4,428 Crs Lalitpur-Lakhnadon NH44 -RB Infra emerges as the successful bidder and has received LOA for Hyderabad Outer Ring Road TOT Project in the State of Telangana. -IRB Infra SPV receives appointed date from NHAI for Chittoor Thachur Hybrid Annuity Project in Tamil Nadu.
Advisory Alert: It has come to our attention that certain individuals are representing themselves as affiliates of Moneycontrol and soliciting funds on the false promise of assured returns on their investments. We wish to reiterate that Moneycontrol does not solicit funds from investors and neither does it promise any assured returns. In case you are approached by anyone making such claims, please write to us at grievanceofficer@nw18.com or call on 02268882347