On February 26, one arm of the Gokhale Bridge was opened to the public after being demolished in 2022. The bridge, which cost Rs 90 crore to build, is an important link between Andheri East and Andheri West. However, during the construction process, the BMC failed to properly align the Gokhale bridge with the Barfiwala flyover. This has left residents and local activists dissatisfied with the BMC. If you want to learn more about how the BMC failed to align the two bridges and what reasons they gave for their failure, watch the video.
first published: Feb 28, 2024 01:41 pm
A collection of the most-viewed Moneycontrol videos.

Rupee Slide Weighs Heavy As Nifty Tests 25,900| Midcaps See Sharp Cuts| Closing Bell Live

Meesho's Rs 5,421 Cr IPO Kicks Off| Post-IPO Playbook, Profitability Path & More| IPO Watch Live

Can Nifty Hold Above 26,000 Amid Currency Jitters? Meesho IPO Opens | Opening Bell Live

Nifty Struggles Below 26,100 On Weekly F&O Expiry As Rupee Hits New Low| Closing Bell Live
You are already a Moneycontrol Pro user.

