HomeNewsTrendsExpert ColumnsBefore celebrating the import embargo on military items, worth checking the results of the defence offsets
Trending Topics

Before celebrating the import embargo on military items, worth checking the results of the defence offsets

Structural tuning is needed to translate India’s decision to impose import embargo on 101 items to boost military industrial capacity in real terms.

August 13, 2020 / 14:46 IST
Story continues below Advertisement

On  August 9, 2020, under the ambitious Atmanirbhar Bharat initiative, the defence ministry (MoD) announced the imposition of an import embargo on 101 military products with a declared intent on boosting national military-industrial capacity. This much-publicised announcement has been cheered by all stakeholders of the Indian defence sector, especially the private manufacturers.

The embargo on imports will be effective in three phases: 69 items (from Water Jet Fast Attack Craft to Field Artillery Tractor (FAT) 6X6 for Medium Guns) by December 2020, 11 items (Wheeled Armoured Fighting Vehicle (AFV) to Conventional Submarines) by December 2021 and the remaining 21 (40mm Under Barrel Grenade Launcher (UBGL) to Long Range Land Attack Cruise Missiles) by December 2022. The includes low to medium technology items like Transportable Radar and Mini Trucks of different sizes to high technology items like Astra Mark I Beyond Visual Range Air to Air Missiles (BVRAAMs) and Communication Satellites. It includes both sub-systems as well as complete systems.

Story continues below Advertisement

The press release by the government lays out the larger intent of the Negative List: ‘……to assess current and future capabilities of the Indian industry for manufacturing various ammunition/weapons/platforms/equipment within India’. It also outlines the lucrative domestic market size by announcing ‘…with the latest embargo, it is estimated that contracts worth almost Rs 4,00,000 crore will be placed upon the domestic industry within the next five to seven years’. The embargo is to be progressively implemented between 2020 and 2024, thus indicating that by late 2020s, Indian military industry should be ready to undertake further challenging military technology projects and be a part of the global military-industrial universe.

Read the fine print