HomeNewsBusinessFirst phase of Zuari bridge almost complete, entire project by April 2023: Dilip Buildcon

First phase of Zuari bridge almost complete, entire project by April 2023: Dilip Buildcon

Atul Joshi, Vice President (Structure), Dilip Buildcon Limited told PTI that the first phase comprising four lanes is "almost complete" and would be ready for the traffic flow once load testing is done and crack barriers are installed.

November 10, 2022 / 11:47 IST
Story continues below Advertisement
(Image: lntecc.com)
(Image: lntecc.com)

Dilip Buildcon Limited, which is constructing the new Zuari bridge, said that the first phase of a cable-stayed bridge termed as India's widest bridge is almost complete and the entire eight-lane project will be completed by April, 2023.

Atul Joshi, Vice President (Structure), Dilip Buildcon Limited told PTI that the first phase comprising four lanes is "almost complete" and would be ready for the traffic flow once load testing is done and crack barriers are installed.

Story continues below Advertisement

The bridge is located on Zuari river at Cortalim village on Margao-Panaji National Highway and is considered as an important link between North and South Goa.

Joshi said that the rest four lanes would be completed by April or May next year, after which it would be the widest bridge of the country.