HomeNewsIndiaChandrayaan-3 mission launch on July 14; soft-landing on lunar surface expected on August 23 or 24

Chandrayaan-3 mission launch on July 14; soft-landing on lunar surface expected on August 23 or 24

ISRO's new heavylift launch vehicle LVM-3 will carry out the Moon mission.

July 06, 2023 / 20:28 IST
Story continues below Advertisement
The Chandrayaan-3 mission carries scientific instruments to study the thermophysical properties of the lunar regolith, lunar seismicity, lunar surface plasma environment and elemental composition in the vicinity of the landing site. (Image source: @isro/Twitter)
The Chandrayaan-3 mission carries scientific instruments to study the thermophysical properties of the lunar regolith, lunar seismicity, lunar surface plasma environment and elemental composition in the vicinity of the landing site. (Image source: @isro/Twitter)

The Indian Space Research Organisation announced on Thursday that the Chandrayaan-3 mission is scheduled to be launched at 2.35 pm on July 14, with the lander expected to soft-land on the surface of the Moon on August 23 or 24.

Chandrayaan-3 is a follow-on mission to Chandrayaan-2 to demonstrate end-to-end capability in safe landing and roving on the lunar surface.

Story continues below Advertisement

The Chandrayaan-3 spacecraft, which will be launched by LVM3 (Launch Vehicle Mark-III) (earlier referred as GSLV Mk III), is a composite of three modules -- propulsion, lander, and rover (which is housed inside the lander).

"LVM3-M4/Chandrayaan-3 Mission:The launch is now scheduled for July 14, 2023, at 2:35 pm IST from SDSC, Sriharikota", the national space agency headquartered here said in a tweet.