Order valued Rs 56 bn
Posted by :
rvk41
Bharat Heavy Electricals (BHEL) has secured a major order for setting up the upcoming 1,980 MW Prayagraj Thermal Power Project (TPP) with Supercritical parameters in Uttar Pradesh, involving three units of 660 MW each.
Valued at Rs 56 billion, the order for the greenfield power project, located at Bara in Allahabad district of Uttar Pradesh, has been placed on BHEL by Prayagraj Power Generation Company (PPGCL), a company owned by Jaiprakash Associates (JAL), and reflects the customer`s confidence in the company`s technological excellence and capability in executing projects of this magnitude.
For information,with regards
rvk41...
Sell or Hold ?
Posted by :
hskumarHolding BHEL @ Rs 2150/-...sell or hold ? Duration 3 months....
BHEL bags orders
Posted by :
pms.swastika
BHEL bags orders
BHEL bags an order worth Rs. 6000 Crs.
Regards
Swastika PMS...
BHEL ORDER
Posted by :
banyanNews Flash: BHEL bags order worth Rs.5600 Cr....
technical view on bhel
Posted by :
dhireshkBuy BHEL at Rs 2,250 with targets of Rs 2,390...
BHEL target 2450
Posted by :
dhireshkBuy BHEL with a target of 2450 and more. ...
INTRADAY HOT PICKS
Posted by :
bobobaiINTRADAY HOT PICKS...... MORE THEN 90% ACCURACY ....... PAY ONLY AFTER SUCCESSION OF TIP........ FOR TERMS AND CONDITIONS CALL AT 9257378762...
Joint Venture
Posted by :
rvk41
Public sector power utility BHEL on Wednesday said it has entered into an agreement with Madhya Pradesh Power Generation Company (MPPGCL) for jointly setting up a thermal power project in the state.
The joint venture company will build a 2x800 MW thermal power plant with supercritical parameters at Khandwa in Madhya Pradesh, BHEL said in a statement.
Supercritical technology ensures lower coal consumption, lower emission, eco-friendly and efficient power generation.
Under the agreement, BHEL and MPPGCL would set up a joint venture company with initial equity being equally subscribed by both partners.
“Subsequently, the equity would be diluted so that the stake of both BHEL and MPPGCL is reduced to 26 per cent each and the balance equity of 48 per cent is subscribed to by financial institutions, banks and other partners,’’ BHEL said.
The order for setting up of the power project would be placed on BHEL by the joint venture company on a nominated basis.
The first unit of the coal-based power plant would come up within 48 months of the order and the second unit will get operational within 54 months, the company added
For information,with regards
rvk41...
Buy BHEL!!!
Posted by :
ashishplBuy for target 2505/2605, Order flow, project completion, strong support at 2150 .... buy now...
Buy in dips for long term
Posted by :
srisri223
Buy BHEL in dips for long terM.
Visit intraday and long term stock tips like IFCI, ARVIND, INDIACEM from stockdreams.blogspot.c om
Now is a time to accumulate cash – and keep the war chests filled with
cash.The talks about an economic recovery in America are simply ways to
brainwash the masses. Once the crash starts, it will time to capture assets
being sold in distress. Some of the biggest banks in the America, UK and
Europe will soon collapse. They will offer us an excellent opportunity to
create wealth.
Visit intraday and long term stock tips like IFCI, ARVIND, INDIACEM from stockdreams.blogspot.c om ...
bhel has support around 2050
Posted by :
dipakgodif break 2050 than you see 1800...
NSE Announcements on BHEL
Posted by :
MMB MessengerBharat Heavy Electricals Ltd has informed the Exchange that "Shri V K Jairath has been appointed as Part-time Non-Official Director on the Board of BHEL, w.e.f. 12th November, 2009". Further a list of Board of Directors of BHEL as on 13.11.2009, incorporating the changes in the Companys directorate shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). ...
Going for Contracts Globaly
Posted by :
rvk41
Public sector Bharat Heavy Electricals (BHEL), an engineering firm for energy and infrastructure sector, will set up a marketing office in Kazakhistan, reports agency sources.
The move is part of BHEL`s plans to expand business overseas. The company already has a MoU with TGR of Hungary for exploring opportunities for supply, renovation and maintenance of boilers in European and the Commonwealth countries.
BHEL has executed several contracts in these regions, including a contract for a 40 MW gas turbine generator set in Kazakhistan.
Currently BHEL is executing two Hydro Power Projects in Tajikistan and a contract for supply of transformers to Azerbaijan.
For information,with regards
rvk41
...
bhel has support around 2050
Posted by :
paisamaster.com
looks so to me as well ..it hasnt gone much
looks to follow below pivotals
R1:2300 S1:2157
R2:2400 S2:1986
...
bhel has support around 2050
Posted by :
gpranshubhel has support around 2050...



Online