1. a) The conveyance of title for 11,043 acres of freehold land of
valueRs. 538.18 crore (previous year 10,884 acres of valueRs. 507.11 crore)
and buildings & structures valued at Rs. 135.58 crore (previous year Rs.
149.05 crore), as also execution of lease agreements for 8,995 acres of
land of value Rs. 252.51 crore (previous year 8,958 acres, value Rs. 244.72
crore) in favour of the Company are awaiting completion of legal
formalities.
b) Leasehold land includes 819 acres valuing Rs. 29.67 crore (previous
year 30 acres valuing Rs.0.05 crore) acquired on perpetual lease and
accordingly not amortised.
c) Land does not include cost of 1,181 acres (previous year 1,181
acres) of land in possession of the Company. This will be accounted for
on settlement of the price thereof by the State Government Authorities.
d) Land includes 1,245 acres of valueRs. 15.03 crore (previous year 1,247
acres of valueRs. 15.09 crore) not in possession of the Company. The
Company is taking appropriate steps for repossession of the same.
e) Land includes an amount of Rs. 118.74 crore (previous year Rs. 115.27
crore) deposited with various authorities in respect of land in
possession which is subject to adjustment on final determination of
price.
f) Possession of land measuring 98 acres (previous year 98 acres)
consisting of 79 acres of free-hold land (previous year 79 acres) and
19 acres of lease hold land (previous year 19 acres) of value Rs. 0.21
crore (previous year Rs. 0.21 crore) was transferred to Uttar Pradesh
Rajya Vidyut Utpadan Nigam Ltd. (UPRVUNL) for a consideration of Rs. 0.21
crore. Pending approval for transfer of the said land, the area and
value of this land has been included in the total land of the Company.
The consideration received from UPRVUNL is disclosed under ''Other
Liabilities'' in Schedule -15 -''Current Liabilities''.
g) The cost of right of use of land for laying pipelines amounting to Rs.
6.46 crore (previous year Rs. 5.76 crore) is included under intangible
assets. The right of use, other than perpetual in nature, are amortised
over the period of legal right to use as per the rates and methodology
notified by CERC Tariff Regulations, 2009 (Regulations, 2009).
h) Cost of acquisition of the right to draw water amounting toRs. 199.52
crore (previous yearRs. 8.41 crore) is included under intangible assets -
Right of Use - Others. The right to draw water is amortized considering
the life period of 25 years as per the rates and methodology notified
by Regulations, 2009.
i) Ministry of Power, Government of India vide its notification no.
2/38/99-BTPS (Volume VII) dated 22nd September 2006 transferred land of
a power station to the Company on operating lease of 50 year. Lease
rent for the year amounting to Rs. 6.13 crore (previous year Rs. 6.08
crore) has been charged to the statement of Profit & Loss Account.
2 a) The Central Electricity Regulatory Commission (CERC) notified the
Regulations, 2009 in January 2009, containing inter-alia the terms and
conditions for determination of tariff applicable for a period of five
years with effect from 1st April 2009. Pending determination of
station-wise tariff by the CERC, sales have been provisionally
recognized atRs. 48,935.31 crore (previous year Rs. 44,473.93 crore) for
the year ended 31st March 2011 on the basis of principles enunciated in
the said Regulations on the capital cost considering the orders of
Appellate Tribunal for Electricity (APTEL) for the tariff period
2004-2009 including as referred to in para 2 (d).
Regulations, 2009 provide that pending determination of tariff by the
CERC, the Company has to provisionally bill the beneficiaries at the
tariff applicable as on 31st March 2009 approved by the CERC. The
amount provisionally billed for the year ended 31st March 2011 on this
basis isRs. 47,519.21 crore (previous yearRs. 43,765.13 crore).
b) For the units commissioned subsequent to 1st April 2009, pending the
determination of tariff by CERC, sales ofRs. 4,528.39 crore (previous
year Rs. 1,735.40 crore) have been provisionally recognised on the basis
of principles enunciated in the Regulations, 2009. The amount
provisionally billed for such units isRs. 4,416.12 crore (previous year Rs.
1,536.50 crore).
c) Sales of Rs. 800.87 crore (previous year Rs. 119.33 crore) pertaining to
previous years have been recognized based on the orders issued
bytheCERC/APTEL.
d) In respect of stations/units where the CERC had issued tariff orders
applicable from 1st April 2004 to 31st March 2009, the Company
aggrieved over many of the issues as considered by the CERC in the
tariff orders, filed appeals with the APTEL. The APTEL disposed off the
appeals favourably directing the CERC to revise the tariff orders as
per the directions and methodology given. The CERC filed appeals with
the Hon''ble Supreme Court of India on some of the issues decided in
favour of the Company by the APTEL. The decision of Hon''ble Supreme
Court is awaited. The Company had submitted that it would not press for
determination of the tariff by the CERC as per APTEL orders pending
disposal of the appeals by the Hon''ble Supreme Court.
Considering expert legal opinions obtained that it is reasonable to
expect ultimate collection, the sales for the tariff period 2004-2009
were recognised in earlier years based on provisional tariff worked out
by the Company as per the directions and methodology given by the
APTEL. As accountal of sales is subject to the decision of the Hon''ble
Supreme Court of India, pending decision of the Hon''ble Supreme Court
of India, a sum ofRs. 1,262.86 crore included in debtors has been fully
provided for during the year. Effect, if any, will be given in the
financial statements upon disposal of the appeals.
e) Consequent to issue of additional capitalisation orders by the CERC,
advance against depreciation required to meet the shortfall in the
component of depreciation to be charged in future years has been
reassessed and the excess determined amounting to Rs. 79.75 crore has
been recognised as sales.
f) During the year, the CERC has issued tariff orders in respect of
some of the stations in compliance with the judgement of APTEL
mentioned at para d) above, and the beneficiaries were billed
accordingly. Since the orders of CERC include those issues which have
been challenged by them before Hon''ble Supreme Court, and are pending
disposal, the impact thereof amounting toRs. 252.22 crore has been
accounted as Advance from customers'' in the Schedule-15 - ''Current
Liabilities''.
3. a) Sundry Debtors - Other debts (schedule 11) includes Rs. 2,698.86
crore (previous year Rs. 1,001.15 crore) towards revenue accounted in
accordance with the accounting policy no. 12.1 which is yet to be
billed.
b) CERC has issued a draft notification dated 3rd September 2010 which
inter-alia provides for upfront truing up of un discharged liabilities
with regard to capital cost admitted by CERC before 1st April 2009. In
anticipation of final notification an estimated amount of Rs. 263.59
crore has been provided for towards tariff adjustment.
4. Due to uncertainty of realisation in the absence of sanction by the
Government of India (GOI), the Company''s share of net annual profits of
one of the stations taken over by the Company in June 2006 for the
period 1st April 1986 to 31st May 2006 amounting to Rs. 115.58 crore
(previous yearRs. 115.58 crore) being balance receivable in terms of the
management contract with the GOI has not been recognised.
5. In terms of guidelines of Department of Public Enterprises (DPE),
Government of India (GOI), issued vide OM:2(70)/08-DPE(WC)-GL-XIV/08
dated 26.11.2008 and OM:2(70)/08-DPE(WC)-GL-VII/09 dated 02.04.2009,
the Company formulated a defined contribution pension scheme and sent
to Ministry of Power (MOP) for their approval. Pending approval of MOP,
an amount ofRs. 94.56 crore during the year and cumulatively Rs. 468.78
crore has been provided up to 31st March 2011.
6. The amount reimbursable to GOI in terms of Public Notice No.38
dated 5th November, 1999 and Public Notice No.42 dated 10th October,
2002 towards cash equivalent of the relevant deemed export benefits
paid by GOI to the contractors for one of the stations amounted to Rs.
276.80 crore (previous year Rs. 276.80 crore) out of which f 269.70 crore
(previous year Rs. 269.70 crore) has been deposited with the GOI and
liability for the balance amount of Rs. 7.17 crore (previous year Rs. 7.17
crore) has been provided for. No interest has been provided on the
reimbursable amounts as there is no stipulation for payment of interest
in the public notices cited above.
7. As per the direction of MOP, a memorandum of understanding was
signed between the Company, Gujarat Power Corporation Ltd. (GPCL) and
Gujarat Electricity Board (GEB) on 20th February 2004 to set up Pipavav
Power Project. The Company disassociated from the Pipavav Power
Project, a wholly owned subsidiary of the Company, on 24th May 2007
after obtaining approval from the MOP. MOP, Government of India,
conveyed its approval vide Presidential Directive No. 5/5/2004-TH-ll
dated 3rd July 2009 for winding-up of the Pipavav Power Development
Company Ltd. (PPDCL). The Board of Directors of NTPC Ltd. have also
given consent for winding up of the PPDCL.
MOP vide Presidential Directive No. 5/5/2004-TH-ll dated 15th April
2010 conveyed the approval of GOI to permit NTPC for winding up of
PPDCL, through striking off the name under Section 560 of the Companies
Act, 1956. Registrar of Companies, National Capital Territory of Delhi
and Haryana (ROC) has conveyed the name of the PPDCL has been
struck-off from the Register of Companies vide their letter dated 28th
January 2011.
Accordingly, investment in the PPDCL amounting toRs. 0.37 crore was set
off in full against the amount received from GPCL in the earlier years
in this regard.
8. The Government of Madhya Pradesh had notified levy of Madhya
Pradesh Grameen Avsanrachana Tatha SadakVikas Adhiniyam (MPGATSVA) tax
on coal with effect from September 2005. The tax was challenged by the
coal supplier before the Hon''bleJabalpur High Court which stayed its
collection in April 2006. Hon''bleJabalpur High Court by its order dated
3rd February 2011 has vacated the interim order of April 2006.
The Central Government issued notification no. GSR 322(E) dated 1i Aug
2007, on royalty which provide for adjustment of cess and tax specific
to coal bearing lands so as to limit the overall revenue to the
royalty.
Various Special Leave Petitions (SLPs) were preferred in the Hon''ble
Supreme Court against the levy by the aggrieved parties where-after the
Hon''ble Supreme Court passed an interim order staying the coercive
collection of the tax. During the year, Hon''ble Supreme Court heard
various SLPs and ordered the assessees to file returns and subsequently
in 6th December 2010 ordered the assessees to pay the taxes without
prejudice to their rights in the pending appeals.
Subsequent to the vacation of the stay, Northern Coal Fields Ltd, filed
SLP in the Hon''ble Supreme Court, which was disposed off on 21.4.2011
in terms of its'' earlier order dated 6th Dec 2010. In view of this,
liability towards MPGATSVA tax for the period from September 2005 to
July 2007 amounting toRs. 255.82 crore has been provided for during the
year with consequent recognition in sales.
9. As a result of issuance of the New Coal Distribution Policy (NCDP)
by Ministry of Coal in October 2007, the Company and Coal India Ltd
(CIL) renegotiated the Model Coal Supply Agreement (CSA) and Model CSA
was signed between the Company & CIL on 29th May 2009. Based on the
Model CSA, coal supply agreements have been signed with the various
subsidiary companies of CIL by all excepting three of the coal based
stations of the Company. The CSAs are valid for a period of 20 years
with a provision for review after every 5 years.
10. The Company challenged the levy of transit fee/entry tax on
supplies of coal to some of its power stations and has paid under
protest such transit fee/entry tax to Coal Companies/Sales Tax
Authorities. Further, in line with the agreement with GAIL India Ltd.,
the Company has also paid entry tax and sales tax on transmission
charges in respect of gas supplies made to various stations in the
state of Uttar Pradesh. GAIL India Ltd. has paid such taxes to the
appropriate authorities under protest and filed a petition before the
Hon''ble High Court of Allahabad challenging the applicability of
relevant Act. in case the Company gets refund from Coal Companies/Sales
Tax Authorities/GAIL India Ltd. on settlement of these cases, the same
will be passed on to respective beneficiaries.
11. MOP, GOI vide letter dated 24.12.2010 has communicated the
discontinuation of one of the Hydro Power Projects of the Company in
the State of Uttarakhand. Subsequently, the Company has issued Letter
of Frustration to the suppliers/vendors of the project.
MOP has sought details of expenditure incurred, committed costs,
anticipated expenditure on safety and stabilization measures, other
recurring site expenses and interest costs, as well as claims of
various packages of contractors/vendors. Management expects that the
total cost incurred, anticipated expenditure on safety and
stabilization measures, other recurring site expenses and interest
costs as well as claims of various packages of contractors/vendors for
this project will be compensated in full. Hence, cost incurred on the
project up to 31.03.2011 amounting to Rs. 748.82 crore has been accounted
as recoverable from GOI and disclosed under ''Claims Recoverable'' in
''Loans and Advances'' (Schedule -14).
12. Issues related to the evaluation of performance and guarantee test
results of steam/turbine generators at some of the stations are under
discussion with the equipment supplier. Pending settlement, liquidated
damages for shortfall in performance of these equipments have not been
recognised.
13. The Company is executing a thermal power project in respect of
which possession certificates for 1,489 acres (previous year 1,489
acres) of land has been handed over to the Company and all statutory
and environment clearances for the project have been received.
Subsequently, a high power committee has been constituted as per the
directions of GOI to explore alternate location of the project since
present location is stated to be a coal bearing area. Aggregate cost
incurred up to 31st March 2011 Rs. 190.19 crore (previous year Rs. 183.10
crore) is included in ''Fixed Assets'' (Schedules 6, 7 and 8). Management
is confident of recovery of cost incurred, hence no provision is
considered necessary.
14. During the year the Company has received an opinion from the
Expert Advisory Committee of the Institute of Chartered Accountants of
India on accounting treatment of capital expenditure on assets not
owned by the Company wherein it was opined that such expenditure are to
be charged to the statement of Profit & Loss Account as and when
incurred. The Company has represented that such expenditure being
essential for setting up of a project, the same be accounted in line
with the existing accounting practice and sought a review. Pending
receipt of communication regarding the review, existing treatment has
been continued as per existing accounting policy.
15. a) Certain loans & advances and creditors in so far as these have
since not been realised/discharged or adjusted are subject to
confirmation/ reconciliation and consequential adjustment, if any.
b) In the opinion of the management, the value of current assets, loans
and advances on realisation in the ordinary course of business, will
not be less than the value at which these are stated in the Balance
Sheet.
16. Effect of changes in Accounting Policies:
During the year, the Office of the Comptroller & Auditor General of
India has expressed an opinion that power sector companies shall be
governed by the rates of depreciation notified by the CERC for
providing depreciation in respect of generating assets in the accounts
instead of the rates as per the Companies Act, 1956. Accordingly, the
Company revised its accounting policies relating to charging of
depreciation w.e.f 1st April 2009 considering the rates and methodology
notified by the CERC for determination of tariff through Regulations,
2009. In case of certain assets, the Company has continued to charge
higher depreciation based on technical assessment of useful life of
those assets. Consequent to this change, prior period depreciation
written back is f 1,116.50 crore, depreciation for the year is lower by
Rs. 279.62 crore. As a result, fixed assets and profit before tax for the
year is higher by f 1,396.12 crore.
Due to the above change, the amount of advance against depreciation
(AAD) required to meet the shortfall in the component of depreciation
in revenue over the depreciation to be charged off in future years has
been reassessed by the Company station-wise as at 1st April 2009 and
the excess determined, amounting to Rs. 727.49 crore has been recognised
as prior period sales.
Further, the amount recoverable from the beneficiaries on account of
deferred tax materialised for the financial year 2009-10 has been
reassessed and excess amount ofRs. 212.67 crore is reversed as''Prior
Period Sales''with equivalent reduction in provision for tax of earlier
years in the Profit and Loss Account.
Further, due to the above change, deferred tax liability (net) and
deferred tax recoverable from the beneficiaries as at 31i March 2010
amounting to Rs. 3,049.41 crore and Rs. 2,840.16 crore respectively have
been reviewed and restated to Rs. 4,415.19 crore and Rs. 3,809.69 crore
respectively. As a result, deferred tax liability as at 31.03.2010 has
increased by Rs. 1,365.78 crore out of which Rs. 969.53 crore is
recoverable from the beneficiaries as per Regulation 39 of Regulations,
2009 and net increase is included in the ''Provision for Deferred tax -
Earlier years'' in the Profit and Loss Account.
17. Revenue grants recognised during the year is Rs. 0.43 crore
(previous year Rs. 1.71 crore).
18. Disclosure as per Accounting Standard (AS) 15:
General description of various defined employee benefit schemes are as
under:
A. Provident Fund
Company pays fixed contribution to provident fund at predetermined
rates to a separate trust, which invests the funds in permitted
securities. Contribution to family pension scheme is paid to the
appropriate authorities. The contribution of f 191.19 crore (previous
year Rs. 159.70 crore) to the funds for the year is recognised as expense
and is charged to the Profit & Loss Account. The obligation of the
Company is to make such fixed contribution and to ensure a minimum rate
of return to the members as specified by GOI. As per report of the
actuary, overall interest earnings and cumulative surplus is more than
the statutory interest payment requirement. Hence no further provision
is considered necessary.
B. Gratuity & Pension
The Company has a defined benefit gratuity plan. Every employee who has
rendered continuous service of five years or more is entitled to get
gratuity at 15 days salary (15/26 X last drawn basic salary plus
dearness allowance) for each completed year of service subject to a
maximum ofRs. 0.10 crore on superannuation, resignation, termination,
disablement or on death.
The Company has a scheme of pension at one of the stations in respect
of employees taken over from erstwhile State Government Power Utility.
In respect of other employees of the Company, pension scheme is yet to
be implemented as stated in Note no. 5 above.
The existing schemes are funded by the Company and are managed by
separate trusts. The liability for the same is recognised on the basis
of actuarial valuation.
C. Post-Retirement Medical Facility (PRMF)
The Company has Post-Retirement Medical Facility (PRMF), under which
retired employee and the spouse are provided medical facilities in the
Company hospitals / empanelled hospitals. They can also avail treatment
as Out-Patient subject to a ceiling fixed by the Company. The
liability for the same is recognised on the basis of actuarial
valuation.
D. Terminal Benefits
Terminal benefits include settlement at home town for employees &
dependents and farewell gift to the superannuating employees. Further,
the Company also provides for pension in respect of employees taken
over from erstwhile State Government Power Utility at another station.
The liability for the same is recognised on the basis of actuarial
valuation.
E. Leave
The Company provides for earned leave benefit (including compensated
absences) and half-pay leave to the employees of the Company which
accrue annually at 30 days and 20 days respectively. 73.33 % of the
earned leave is en-cashable while in service, and upto a maximum of 300
days on separation. Half-pay leave is en-cashable only on separation
beyond the age of 50 years up to the maximum of 240 days as per the
rules of the Company. The liability for the same is recognised on the
basis of actuarial valuation.
The above mentioned schemes (C, D and E) are unfunded and are
recognised on the basis of actuarial valuation.
The summarised position of various defined benefits recognised in the
profit and loss account, balance sheet are as under:
(Figures given in {) are for previous year)
F. Other Employee Benefits
Provision for Long Service Award and Family Economic Rehabilitation
Scheme amounting to Rs. 2.76 crore (previous year credit of Rs. 3.42 crore)
for the year have been made on the basis of actuarial valuation at the
year end and debited to the Profit & Loss Account.
19. The effect of foreign exchange fluctuation during the year is as
under:
i) The amount of exchange differences (net) debited to the Profit &
Loss Account is Rs. 6.50 crore (previous year credit of Rs. 18.91 crore).
ii) The amount of exchange differences (net) debited to the carrying
amount of fixed assets and Capital work-in-progress is Rs. 168.29 crore
{previous year credit of Rs. 1,181.54 crore).
20. Borrowing costs capitalised during the year isRs. 1,743.61 crore
(previous year Rs. 1,480.40 crore).
21. Segment information:
a) Business Segments:
The Company''s principal business is generation and sale of bulk power
to State Power Utilities. Other business includes providing
consultancy, project management and supervision, oil and gas
exploration and coal mining.
b) Segment Revenue and Expense
Revenue directly attributable to the segments is considered as Segment
Revenue. Expenses directly attributable to the segments and common
expenses allocated on a reasonable basis are considered as Segment
Expenses.
c) Segment Assets and Liabilities
Segment assets include all operating assets in respective segments
comprising of net fixed assets and current assets, loans and advances.
Construction work-in-progress, construction stores and advances are
included in unallocated corporate and other assets. Segment liabilities
include operating liabilities and provisions.
22. Related Party Disclosures:
a) Related parties:
i) Joint ventures:
Utility Powertech Ltd., NTPC-Alstom Power Services Private Ltd.,
BF-NTPC Energy Systems Ltd. ii) Key Management Personnel:
Shri Arup Roy Choudhury1 Chairman and Managing Director
Shri R.S. Sharma2 Chairman and Managing Director
Shri Chandan Roy3 Director (Operations)
Shri A.K. Singhal Director (Finance)
Shri R.C. Shrivastav4 Director (Human Resources)
Shri I.J. Kapoor Director (Commercial)
Shri.B.P.Singh Director (Projects)
Shri D.K.Jain5 Director (Technical)
Shri S.P.Singh6 Director (Human Resources)
Shri N.N.Misra7 Director (Operations)
1. W.e.f. 1a September 2010 2. Superannuated on 31st August 2010 3.
Superannuated on 31a July 2010 4. Superannuated on 30th June 2010
5.W.e.f. 13thMay2010 6.W.e.f. 16thOctober2010 7.W.e.f. 19thOctober2010.
26. Research and development expenditure charged to revenue during the
year is Rs. 28.30 crore (previous year Rs. 20.56 crore).
28. As required by Accounting Standard (AS) 28 ''Impairment of Assets''
notified under the Companies (Accounting Standards) Rules, 2006, the
Company has carried out the assessment of impairment of assets. Based
on such assessment, there has been no impairment loss during the year.
30. The pre-commissioning expenses during the year amounting to Rs.
112.75 crore (previous year Rs. 145.88 crore) have been included in Fixed
Assets/Capital work-in-progress after adjustment of pre-commissioning
sales of Rs. 34.96 crore (previous year Rs. 96.10 crore) resulting in a net
pre-commissioning expenditure of Rs. 77.79 crore (previous year Rs. 49.78
crore).
35. Estimated amount of contracts remaining to be executed on capital
account and not provided for as at 31st March 2011 is Rs. 23,779.74 crore
(previous year Rs. 30,534.58 crore).
36. Contingent Liabilities:
1. Claims against the Company not acknowledged as debts in respect of:
(i) Capital Works
Some of the contractors for supply and installation of equipments and
execution of works at our projects have lodged claims on the Company
for Rs. 3,485.85 crore (previous year Rs. 3,879.77 crore) seeking
enhancement of the contract price, revision of work schedule with price
escalation, compensation for the extended period of work, idle charges
etc. These claims are being contested by the Company as being not
admissible in terms of the provisions of the respective contracts.
The company is pursuing various options under the dispute resolution
mechanism available in the contract for settlement of these claims. It
is not practicable to make a realistic estimate of the outflow of
resources if any, for settlement of such claims pending resolution.
(ii) Land compensation cases
In respect of land acquired for the projects, the land losers have
claimed higher compensation before various authorities/courts which are
yet to be settled. In such cases, contingent liability of Rs. 1,851.08
crore (previous year Rs. 1,786.25 crore) has been estimated.
(iii) Others
In respect of claims made by various State/Central Government
departments/Authorities towards building permission fees, penalty on
diversion of agricultural land to non-agricultural use, Nala tax, Water
royalty etc. and by others, contingent liability ofRs. 1,246.62 crore
(previous year Rs. 1,248.78 crore) has been estimated.
The contingent liabilities referred to in (i) above, includes an amount
of Rs. 1,495.35 crore relating to the hydro power project stated in Note
no. 11 above, for which Company envisages possible reimbursement from
GOI in full. In respect of balance claims included in (i) and in
respect of the claims mentioned at (ii) above, payments, if any, by the
company on settlement of the claims would be eligible for inclusion in
the capital cost for the purpose of determination of tariff as perCERC
Regulations subject to prudence check by the CERC. In case of (iii),
the estimated possible reimbursement is Rs. 146.97 crore (previous year Rs.
428.90 crore).
2. Disputed Income Tax/Sales Tax/Excise Matters
Disputed Income Tax/Sales Tax/Excise matters are pending before various
Appellate Authorities amounting to Rs. 2,465.26 crore (previous year Rs.
2,292.41 crore) are disputed by the Company and contested before
various Appellate Authorities. Many of these matters are disposed off
in favour of the Company but are disputed before higher authorities by
the concerned departments. In such cases, the company estimated
possible reimbursement of Rs. 1,793.36 crore (previous year Rs. 1,793.36
crore)
3. Others
Other contingent liabilities amounts to Rs. 398.74 crore (previous year Rs.
266.14 crore)
Some of the beneficiaries have filed appeals against the tariff orders
of the CERC. The amount of contingent liability in this regard is not
ascertainable.
39. Figures have been rounded off to nearest rupees in crores up to
two decimals.
40. Previous year figures have been regrouped /rearranged wherever
considered necessary.
|